Songs / F Minor · 123 BPM

How Long by Lead Belly

How Long by Lead Belly is in the key of F Minor and runs at 123 BPM, a steady dance-floor tempo. Its Camelot code is 4A, which is what you match against when you are mixing it harmonically with another track.

BPM123Tempo
KeyF MinorMusical key
Camelot4AFor harmonic mixing
Energy77Out of 100
Danceability43Out of 100
Loudness-10.9dBFS

What mixes with How Long

On the Camelot wheel, How Long sits at 4A. These keys blend with it without clashing, so tracks in them are safe to beatmatch in or out:

  • 5Aenergy boost
  • 3Aenergy drop
  • 4Brelative major

Mixes well with How Long

Real tracks from the database that are both harmonically compatible and close enough in tempo to beatmatch — ±6% on a pitch fader, or half/double time. Same key first, then the nearest energy step on the wheel.

Tracks to mix into it

Other analyzed songs in a compatible key, ready to line up next in a set:

More songs in F Minor

All songs in F MinorAll songs at 123 BPM →Camelot wheel →

These figures come from analyzing an official 30-second preview of the track with TuneBad’s in-browser engine. Tempo and key are reliable, but a preview is a sample of the full song, so treat them as a strong estimate. For an exact read, analyze the full file yourself — it is free and runs entirely in your browser.

Analyze a song yourself